Wiring Works - Samsung MIM-E03CN Installation Manual

Air to water heat pump
Hide thumbs Also See for MIM-E03CN:
Table of Contents

Advertisement

Wiring works

• Field-supplied electrical components such as power switch, circuit breakers, wires, terminal blocks, etc must be
properly chosen with compliance with national legislation or regulation.
CAUTION
• Switch off the power supply before making any connections.
• All field wiring and components must be installed by a licensed electrician.
• Use a dedicated power supply.
• All power connections must be protected from dew condensation by thermal insulation.
• The system shall be earthed. Do not earth the unit to a utility pipe, surge absorber or telephone earth.
Incomplete earth may cause electrical problems.
Layout of PCB
SMPS circuit
14
13
No.
FR Control
CNS003(Green)
Temp. Sensor for DHW Tank
CNS042(Yellow)
Temp. Sensor for Mixing Valve
CNS045(Blue)
10
EEPROM
DIP switch
Micom
Load control
ON
16
1
2
3
4
Note
17
2
7
11
4
5
3
2-WIRE COMM
12
15
1
No.
Flow Switch
CNS041(Yellow)
Temp. Sensor for Heater
CNS047(Black)
PV(Photovoltaic) Control Signal / Peak power control Signal
CNS046(Black)
6
8
9
1
10
Note

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mim-e03en

Table of Contents