Rigging the Unit for Lifting
Rig the unit for lifting by attaching four cables to the holes
in the base rail of the unit. See figures 1 through 3.
1 - Remove protective packaging before rigging the
unit for lifting.
2 - Connect the rigging to the holes in each corner of
the unit's base.
3 - All panels must be in place for rigging.
4 - Place a field-provided H-style frame just above the
top edge of the unit. The frame must be of adequate
strength and length. (An H-style frame will prevent
the top of the unit from being damaged.)
Lifting point should be directly above the center of gravity.
Caution - do not walk on unit
Important - all panels must be in place for rigging.
FIGURE 1. ELITE SERIES AIR CONDITIONERS
(ONE FAN)
.
Page 13
Lifting point should be directly above the center of gravity.
Caution - do not walk on unit
Important - all panels must be in place for rigging.
FIGURE 2. ELITE SERIES AIR CONDITIONERS
(TWO FANS)
Lifting point should be directly above the center of gravity.
Caution - do not walk on unit
Important - all panels must be in place for rigging.
FIGURE 3. ELITE SERIES AIR CONDITIONERS
(FOUR FANS)
.
.