Important: bathroom locations and clearances
•
The boiler must not be installed in Zone 1
•
Any switch or appliance control using mains electricity
must not be within reach of a person using the bath
or shower
•
Electrical switches (other than pull cords), fused spurs
and socket outlets must not be situated in the bathroom
Radius 600mm
*Without the end wall, zone 2 must extend 600mm from the bath
28
•
A boiler fi tted with a mechanical timer or RF mechanical
timer (receiver) or FW100 controller may only be installed
outside the shaded area. A boiler with any other timer
fi tted (or blanking panel for an optional programmer) can
be installed in zone 2.
•
Additional Residual Current Device (RCD) protection may
be required.
Refer to the latest IEE wiring regulations.
Radius 600mm