Initial Set-Up; Main Power Installation - Graco Gusmer H-20 Pro Operation

Proportioner
Table of Contents

Advertisement

Initial Set-up

Main Power Installation

Installing this equipment requires access to parts that
may cause electric shock or other serious injury if work
is not performed properly. Have a qualified electrician
connect power and ground to main power switch termi-
nals. Ensure your installation complies with all
National, State, and Local safety and fire codes.
CAUTION
Ensure main power source meets all electrical
requirements specified on nameplate of proportioning
unit. Also ensure main power source has a dedicated
fuse disconnect. Power cord is not supplied.
1. Open electrical console and connect main power
cord as follows:
a. Feed power cord through strain relief in bottom
of console.
Single-Phase Units: connect power leads to L1
and L2.
Three-Phase Units: connect power leads to L1,
L2, and L3.
380V Three-Phase Units: also connect neutral
wire to blue neutral terminal block on circuit
breaker rail.
F
. 7: Main Power Connection
IG
14
F
IG
2. Fill hydraulic reservoir through vented filler neck with
3. Check hydraulic pump to ensure it is full with
Main Power
Disconnect
(Rear)
F
IG
b. Connect ground wire to Ground Lug located
inside console near strain relief opening.
. 8: Ground Lug
approximately 24 gallons of hydraulic fluid. Recom-
mended fluid: Mobil DTE 24 or 25. (Iso Grade
32/46, Viscosity Index 98-100, Superior Anti-wear
Type.)
Do not overfill reservoir. Level indicator should read
approximately 1/2 full with fluid.
hydraulic fluid as follows:
. 9: Hydraulic Fluid Level
a. Disconnect hydraulic hose from 90° fitting on
top of pump.
b. Remove 90° fitting from top of pump and deter-
mine that fluid level is to top of threaded hole.
Initial Set-up
90° Fitting
311392C

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gusmer h-35 pro

Table of Contents