Graco Gusmer H-20 Pro Operation page 17

Proportioner
Table of Contents

Advertisement

2. Connect heated hose assembly to isolation hoses:
a. Lay out hose assemblies end-to-end as shown
in F
. 12. A- (isocyanate) hoses are RED. B-
IG
(resin) hoses are BLUE.
F
. 12: Hose Connection (step a)
IG
b. Connect heated hoses to isolation hoses. To
ensure a leak-proof chemical connection, do not
cross-thread or over-tighten fittings. See F
13.
c. Connect air hoses and tighten fittings. See F
13.
F
. 13: Hose Connection (steps b and c)
IG
d. Install isolator between chemical hose fittings.
Use small amount of tape to hold in place. See
F
. 14.
IG
Always install isolator to prevent damage to fittings,
but do not tape fully in place until after hoses are
pressurized and free of leaks.
311392C
F
. 14: Hose Connection (step d)
IG
e. Connect FTS harness plugs. To ensure a
secure electrical connection, place protective
isolator boot over each plug and tape together.
See F
IG
FTS Harness
.
IG
Connection
secured with
tape
.
IG
F
. 15: Hose Connection (steps e and f)
IG
f.
Plug Power-Lock
Secure connection with cable tie provided; fail-
ure to do so will disrupt hose heat system if con-
nectors separate. See F
3. Repeat Step 2 to add additional hose assemblies.
. 15.
Hose Heat Power-Lock
Connection secured with cable tie
hose heat connectors.
. 15.
IG
Initial Set-up
17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gusmer h-35 pro

Table of Contents