UTICA BOILERS MAHF-75 Installation, Operation And Maintenance Manual page 6

Condensing gas fired boiler
Table of Contents

Advertisement

Fu lly Asse m ble d Boile r
D H W Opt ion a l Pipe
H e a t On ly Boile r
* Verify proper m odel size before use.
For Pa r t s list s se e m a n u a l 2 4 0 0 1 3 5 0 5 in clu de d
w it h you r boile r lit e r a t u r e pa ck a ge .
NOTICE
Using proper brazing or soldering t echnique,
insert copper flush bushing into copper tee
wit h t hreading up and non- t hreaded end down.
I f t he t hreaded end is not UP t he TP gauge
cannot engage t he t hreads in t he bushing.
V ERI FY CON TEN TS RECEI V ED
3 0 PSI Sa fe t y Re lie f
Va lve
Coppe r Flu sh Bu sh in g
1 / 2 " x 1 / 4 " N PT
Te m pe r a t u r e Pr e ssu r e
Ga u ge ( 2 " Sh a n k )
Coppe r Te e
1 - 1 / 4 " x 1 - 1 / 4 "x 1 / 2 "
Threaded End
Non-Threaded
End
Copper Tee
2
3 / 4 N PT Ba ll Ga s
Shutoff Valve
I ncludes Essent ial
Docum ent s and Warrant y
11x17 Wire Diagram s
D ocu m e n t Pa ck a ge
240013503 REV A, [ 03/ 15/ 2022]

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mahf-100Macf-115Mahf-125Macf-150Mahf-165Macf-205

Table of Contents