Bradford White TTW ULG2PV50H565N19 Installation And Operation Instruction Manual page 17

Power vent gas water heater
Table of Contents

Advertisement

Venting continued-
3" (7.6 cm) VENT CONNECTOR LENGTHS FROM INSIDE WALL FOR
LOW GROUND CLEARANCE INSTALLATIONS
Terminating
(2) 90° Elbows with (1) 90° Elbow
(2) 90° Elbows with (1) 90° Elbow
(2) 90° Elbows with (1) 90° Elbow
(2) 90° Elbows with (1) 90° Elbow
4" (10.2 cm) VENT CONNECTOR LENGTHS FROM INSIDE WALL FOR
Terminating (Reduce 4" to 3")
(Reduce 10.1 cm to 7.6 cm)
(2) 90° Elbows with (1) 90° Elbow
(2) 90° Elbows with (1) 90° Elbow
(2) 90° Elbows with (1) 90° Elbow
(2) 90° Elbows with (1) 90° Elbow
(2) 90° Elbows with (1) 90° Elbow
HIGH ALTITUDE INSTALLATIONS FOR ELEVATIONS OVER 2,000
FEET (762 m) ABOVE SEA LEVEL
The capacity of the induced draft blow er declines w ith increasing altitude
due to a reduction in the air density. In order to assure safe and reliable
performance of the w ater heater, contact the supplier for high altitude kit.
LOW GROUND CLEARANCE INSTALLATIONS
TABLE 3
# of
Max Straight
Elbows
Length ft (m)
1
2
3
4
TABLE 4
# of
Max straight
Elbows
Length ft (m)
1
2
3
4
5
17
48 gal.
30 (9.1)
25 (7.6)
20 (6.1)
15 (4.6)
48 gal.
160 (48.8)
155 (47.2)
150 (45.7)
145 (44.2)
140 (42.7)
Min
straight
Length
ft (m)
5 (1.5)
5 (1.5)
5 (1.5)
5 (1.5)
Min
straight
Length
ft (m)
10 (3.1)
10 (3.1)
10 (3.1)
10 (3.1)
10 (3.1)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ttw ulg2pv50h563n19-264Ttw ulg2pv50h563n47526

Table of Contents