Draining The Boiler On The Dhw Side - Viessmann FB2A Installation And Service Instructions For Contractors

Compact energy tower with a gas condensing boiler, 4.8 to 26 kw natural gas and lpg version, g.c. no: 47-819-18/47-819-19 19 kw/26kw
Table of Contents

Advertisement

Commissioning, inspection, maintenance
Further details regarding the individual steps

Draining the boiler on the DHW side

42
1. Connect hose to drain valve and
route into a suitable container or drain
outlet.
Note
Ensure adequate ventilation in the
DHW pipework.
2. Turn drain valve from lever position
A to lever position B or C as
required.
■ Lever position B: Drain heating
system excluding cylinder via the
cold water connection.
■ Lever position C: Drain heating
system and cylinder via the DHW
connection. Cold water connection
remains filled.
(cont.)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vitodens 242-f

Table of Contents