FILTER CHANGE AND FLUSHING PROCEDURE

Recommended: Replace mineral feed cartridge
every 6–12 months. For 200 and 375 systems use 4CM
cartridge. RO membranes should be replaced every
12-24 months. Prefilters should be replaced every 4-6
months when capacity is reached, or when feed water
pressure or flow becomes inadequate.
REMOVE FILTERS
1. Turn inlet valve right to the OFF (horizontal) position.
NOTE: Feed water is shut off to filters in this "filter
change" position.
2. Place bucket under RO processor. Open permeate
sample port valve (pointing down) to release pressure.
3. Make sure incoming pressure is at 0 psi.
4. Remove pre-filter, mineral addition, and membrane.
Twist filters a quarter turn to left and pull down.
Keep membrane if it will not be replaced. Dispose of
old cartridges that are being replaced.
REPLACE PRE-FILTER AND MINERAL ADDITION
CARTRIDGES, ADD PLUG TO MEMBRANE PORT
5. a. Add new pre-filter to position 1
(insert and turn 90 degrees to right).
b. Add new mineral addition cartridge to position 2
(insert and turn 90 degrees to right).
c. Add RO membrane bypass plug (stored under cover)
to the farthest right position (insert and turn 90
degrees to right).
6. Close the permeate sample port valve (pointing left).
FLUSH PRE-FILTER AND MINERAL CARTRIDGES
7. Turn reject flush valve to open position (pointing down).
8. Close tank valve.
• Optimized water to equipment will be paused
during this step.
9. Turn outlet valve to closed position – putting
equipment into BYPASS.
10. Direct end of the tank sampling valve tube into a
bucket or drain. Open tank sampling valve.
11. Turn inlet valve to open (vertical) position.
• Water will start to fill pre-filter and mineral
cartridges.
• Water will run from the reject line and tank
sampling valve.
12. Flush pre-filter and mineral cartridge for 10 minutes
or until water runs clear.
16 | PENTAIR EZ-RO INSTALLATION AND OPERATION GUIDE
Proof April 18, 2022
1
2
remove all three
remove all three
3
4
pre-
pre-
mineral
mineral
memb.
memb.
filter
filter
addn.
addn.
plug
plug
permeate
permeate
sample
sample
port
port
5
6
valve
valve
reject
flush
valve
closed
closed
7
8
tank
tank
sampling
sampling
valve
valve
9
10
(open)
(open)
11
12
FOODSERVICE.PENTAIR.COM
FILTER CHANGE AND FLUSHING PROCEDURE (CONTINUED)
RETURN EXISTING RO MEMBRANE OR REPLACE
WITH NEW RO MEMBRANE (IF REQUIRED)
13. Turn inlet valve to closed position (horizontal).
14. The psi gauge will reduce to 0 psi.
15. Remove membrane bypass plug (turn 90 degrees,
left and pull down). Store under cover.
16. Insert RO membrane into the farthest right position
(insert and turn 90 degrees to right).
17. Turn inlet valve to open position (vertical).
• Water will start to flush through membrane. Water
will run from reject line and tank sampling valve.
18. Close tank line sampling valve.
19. Open tank valve if using existing membrane. Leave
closed if installing new membrane.
FLUSH NEW MEMBRANE
IF REUSING EXISTING MEMBRANE, SKIP TO STEP 25
20. If needed, put system into partial bypass.
• Turn inlet valve 45 degrees.
• Turn outlet valve to the right.
NOTE: Partial bypass allows feed water to go to
equipment and also allows water to flush RO membrane.
The partial bypass setting will allow untreated water to
go to equipment during the RO membrane flushing.
21. Make sure that the reject flush valve and the
permeate sample port valves are both open.
Open = pointing down.
22. Continue to flush membrane for one hour.
23. After one hour close reject flush valve.
Closed = pointing left.
24. Continue to flush membrane for 23 hours.
NOTE: Permeate water can be flushed through the
tank sampling port instead of the permeate sample
port. To do this, close the tank valve, close the
permeate sample port and open the tank sampling port.
You can run additional tubing from the tank sampling
port to a drain.
PENTAIR EZ-RO INSTALLATION AND OPERATION GUIDE
Proof April 18, 2022
13
14
remove
remove
plug
plug
15
16
tank
tank
sampling
sampling
valve
valve
17
18
(closed)
(closed)
partial
partial
bypass
bypass
open
open
19
20
reject
open
open
flush
valve
permeate
sample
port
open
open
21
valve
22
reject
closed
closed
flush
23
valve
HOURS
23
23
24
FOODSERVICE.PENTAIR.COM | 17