Mitsubishi Electric Smart Multi MXZ-SM36NAM-U1 Data Book page 45

Air conditioning systems
Table of Contents

Advertisement

10. M-NET CONTROL
10-3-4. Power supply to LM-AP
1-phase 208-230VAC power supply is needed.
The power supply unit PAC-SC51KUA is not necessary when connecting only the LM-AP. Yet, make sure to change
the power supply changeover connector CN41 to CN40 on the LM-AP.
10-3-5. Power supply to expansion controller
1-phase 100-240VAC power supply is needed.
The power supply unit PAC-SC51KUA is not necessary.
The expansion controller supplies power through TB3, which equals 6 indoor units. (refer to Table 2)
10-3-6. Power supply to BM ADAPTER
1-phase 100-240VAC power supply is needed.
The power supply unit PAC-SC51KUA is not necessary when only BM ADAPTER is connected.
Yet, make sure to move the power jumper from CN41 to CN40 on the BM ADAPTER.
10-3-7. Power supply to AE-200A/AE-50A/EW-50A
1-phase 100-240VAC power supply is needed.
The power supply unit PAC-SC51KUA is not necessary when connecting only the AE-200A/AE-50A/EW-50A.
M-P0855
S-Series
43

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents