Outdoor Unit - Panasonic CS-S9TKV Service Manual

Hide thumbs Also See for CS-S9TKV:
Table of Contents

Advertisement

4.2

Outdoor Unit

4.2.1
CU-S9TKV
Space necessary for
installation
100 mm
100 mm
1000 mm
Anchor Bolt Pitch
261 × 474
<Side View>
Unit : mm
4.2.2
CU-S12TKV
Space necessary for
installation
10 cm
10 cm
100 cm
Anchor Bolt Pitch
320 x 570
<Side View>
Unit : mm
<Top View>
18
(650)
88
474
<Front View>
736
<Top View>
22
780
(104.7)
<Front View>
88
3-way valve at Gas side
(Low Pressure)
2-way valve at Liquid side
(High Pressure)
67.6
570
104.9
60.5
2-way valve at
Liquid side
(High Pressure)
3-way valve at
Gas side
(Low Pressure)
R32
R E F R I G E R A N T
14
<Side View>
3
8
230
1
5
<Side View>
39
289

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents