4
Diagnostic Testing Details
DGN Testplan Description and Flow
DGN Testplan Description and Flow
Sequence 00: Global Reset
Sequence 01: SLU Detection
Sequence 02: PXI and PCI Modules Detection
Sequence 03: Instrument Matrix Detection
38
The DGN testplan comprises basic tests to verify the system
internal connections and the basic functions of the
instruments.
This section include IPC information queries, instrument
initializations, and reset. This section also clears the
parameter in the symbol tables.
This section first checks the presence of the SLU in the
system topology file. The SLU must be detected to continue
the test. Otherwise, the testplan will stop. This section will
list down all the cards present in the SLU from slot 11 to
slot 21.
This section first checks the presence of the PXI and PCI
modules in the system topology file and lists down the
present modules. This section will also display the modules
serial number.
This section detects the presence of the Instrument Matrix
in the system topology file. The Instrument Matrix must be
present in the SLU on slot 21 to continue the test.
Otherwise, the testplan will stop.
TS-8989 Diagnostics User's Guide