Page 1
P/N 110881 Issued 12/99 N E W C O E N T E R P R I S E S INSTALLATION and OPERATION MANUAL for OCS-16A BREWERS BREWER SPECIFICATIONS CANADA Model Width Length Height 120V Amps 120V Amps OCS-16A 14”...
PLUMBER'S INSTALLATION INSTRUCTIONS CAUTION: Leave brewer unplugged until plumbing is completed. 1) Flush water line before installing brewer. Brewer should be connected to COLD WATER LINE for best operation. 2) Water pressure should be at least 20 lbs. For less than a 25 ft run, use 1/4" copper tubing and connect to 1/2" or larger water line.
COFFEE PREPARATION PROCEDURES 1) Place filter into brew basket. 2) Put the appropriate amount of ground coffee into the filter for the volume of coffee being brewed. 3) Slide the brew basket into holder. 4) Remove the dispenser lid unless it is a brew through design. Place the dispenser directly under the brew basket. 5) Press brew start/stop switch.
Newco Enterprises, Inc. Prompt disposition will be made if item proves to be defective, within warranty. Before returning any item, write or call Newco, or the dealer, from whom the product was purchased, giving model number, serial number, and date of purchase, and describe the nature of the defect.