Assembly Procedure, Necessary Equipment, And Schedule - Komatsu D155A-6 Assembly Instruction Manual

Bulldozer
Hide thumbs Also See for D155A-6:
Table of Contents

Advertisement

Assembly procedure, necessary equipment, and schedule

Assembly procedure, necessary equipment, and schedule
a Any change of the schedule caused by weather is not included.
a Special field work shall be arranged separately.
Schedule
Trailer must arrive at field
before 8:00
Wrecker
Working hours
Number of workers
Total man-hours
1st day
8:00 10:00 12:00 14:00 16:00 18:00 8:00 10:00 12:00 14:00 16:00 18:00
Unloading trailer
Installing tracks
Assembling blade
sub-assembly
25 ton x 2 units
8H
3 workers
24H
4
Installing ripper
Installing
blade
Grand
total
2nd day
Inspection
Washing,
touching up
User delivery
10 ton x 1 unit
6H
3 workers
18H
42H