KAUKAN KAC-1.5 Instruction Handbook Manual page 5

Table of Contents

Advertisement

1 PHASE AC220V
MODEL
KAC-1.5
KAC-2
KAC-3
KAC-4
KAC-6
WARNING
3. START-UP PRODUCEDURE
3.1 Preliminary inspection
Check that:
The main power voltage and frequency correspond to the values stamped on the chiller's name panel.
-
-
The water pipes are rightly connected.
3.2 Starting
1. Turn on the main power to the air conditioner.
2. Set the target temperature on the panel.
WARNING
3.3 Stopping
To stop the air conditioner, please turn off the main power input.
INFORMATION
3
WIRE CROSS SECTION (mm² )
The table above is designed based on a KAUKAN standard chiller. For special
requirement, please adopt the proper power cables and breakers according to
the running current shown on the test report
The temperature indicated on the panel is the in-box temperature, measured by
sensor probe.
Fail to follow the instruction will disqualify any warranty claim.
0.75
1.25
1.25
1.25
1.25
AUTOMATIC BREACEK
3
4
4
6
8

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Kac-2Kac-3Kac-4Kac-6

Table of Contents