LIMITED WARRANTY This product is inspected and complies with KAUKAN’s quality standard. Should the failure happen during the warranty period under normal operating condition, we will be responsible for repairing. 1. Warranty Period One year, from the date of the delivery.
Read the instruction manual carefully before proceeding with start-up, operation, maintenance, or any other jobs on the machine 1. GENERALITY KAC type industrial air conditioners are available in various size with cooling capacities rang up to 1.6kcal, computed on the following operating conditions: - air ambient temperature: +28º...
2. INSTALLATION Transportation Decide the method of lifting based on the weight shown on the label. The WARNING hanger/carrier should be securely stable. Tilting is prohibited . Upon receiving the cooling unit, check if there is any damage caused during the transportation. The unloading/carrying equipment should be with greater capacity than the cooling unit itself.
Page 5
KAC-4 1.25 KAC-6 1.25 The table above is designed based on a KAUKAN standard chiller. For special WARNING requirement, please adopt the proper power cables and breakers according to the running current shown on the test report 3. START-UP PRODUCEDURE 3.1 Preliminary inspection...
CONTROL PANEL 4.1 Description and Functions: a) (DISPLAY): 1.) To show the value of electrical box temperature or setting temperature. To show the parameter item and value. (▲) button: 1.) To enter the temperature setting mode (press and hold for 3 seconds, display shows “888”) 2.) To input the setting value incrementally.
Only certified engineers are allowed to operate the parameter setting. Consult WARNING your agent before operation. 4. GENERAL INFORMATION 5.1 Efficient Cooling: To maximize the cooling efficiency, the working condition must be: a) With low ambient temperature b) With sufficient air flow 5.2 Air filters The air filter keeps the cooler interior and the condenser fins from dirt.
Page 8
6.2 Monthly service 1. Clean the air filter and condenser. 2. Check the wirings, and motor running condition. 3. Check all screws/bolts/hose clamps…etc, retighten if necessary. 4. Check if there is any leakage (oil mark). Call the service engineer when you find any. 6.3 Checking Refrigerant leakage Fill in the system ONLY with anhydrous nitrogen, using a 15-bar gas bottle with a pressure reducing valve.
Page 9
7. RETIRING THE OIL COOLER Once the cooler reaches its life time and is ready for retirement, please follow the following procedures: The refrigerant has to be collected by trained people and sent to proper collecting center. The lubricants and oils have to be collected and sent to proper collecting center. The frame and components have to be disassembled and sorted, particularly copper and aluminum, and then recycled accordingly.