Download Print this page

Goodman MBR Series Technical Information Manual page 20

Hide thumbs Also See for MBR Series:

Advertisement

WIRING DIAGRAMS
Two Speed Heat Pump with Single or Two-Stage Heating
(Options for Emergency Heat) with Conventional Two-Stage Thermostat
NOTES:
1.) Y ENABLES HI SPD FAN COOLING
2.) E AND W2 ENABLE HI SPD FAN HEATING
3.) IF OT2 PJ2 JUMPER IS CUT, E AND W2 ENABLE LO
SPD FAN HEATING
4.) CUT HUM PJ6 JUMPER IF USING HUMIDISTAT
STAT OPENS ON HUMIDITY RISE
5.) DIP SWITCH #4 MUST BE IN THE "OFF" POSITION
NOTES:
1.) Y ENABLES HI SPD FAN COOLING
2.) E ENABLES LO SPD FAN HEATING
W2 ENABLES HI SPD FAN HEATING
3.) OT1 PJ4 MUST BE CUT FOR THIS
CONFIGURATION
4.) CUT HUM PJ6 JUMPER IF USING HUMIDISTAT
STAT OPENS ON HUMIDITY RISE
5.) DIP SWITCH #4 MUST BE IN THE "OFF" POSITION
Wiring is subject to change. Always refer to the wiring diagram on the unit for the most up-to-date wiring.
20
HIGH VOLTAGE!
DISCONNECT ALL POWER BEFORE SERVICING OR INSTALLING THIS
UNIT. MULTIPLE POWER SOURCES MAY BE PRESENT. FAILURE TO
DO SO MAY CAUSE PROPERTY DAMAGE, PERSONAL INJURY OR DEATH.
RTG
HEATPUMP
R
Y2
Y1
C
O
W2
HEATPUMP
C O N D E N S E R
O
W2
ED
R
YCON COM
HEATPUMP - WITH 1 STG EMHT 1 STG AUX HEAT
RTG
HEATPUMP
R
Y2
C
O
Y1
W2
HEATPUMP
C O N D E N S E R
O
W2
ED
R
YCON COM
HEATPUMP - 2 STG EMHT 1 STG AUX HEAT
ROOM
THERMOSTAT
E
O
C
R
G
W2
THERMOSTATS
OTC
OT1
OT2
C
R
Y1
E\W1
W/W2
OUTDOOR
HEATPUMP
C O N D E N S E R
O
YCON COM
W2
ED
R
W1
W2
C
R
24 VAC
S
W1
W2
WI
OT1
PJ4
TC
H
PJ2
OT2
HUM
PJ6
DI
PLEASE REFER
P
O
O
TO MANUAL
N
FF
FOR PROPER
DIP SWITCH
GOODMAN MFG. CO. L.P.
CONFIGURATION.
ROOM
THERMOSTAT
E
O
C
R
W2
THERMOSTATS
OT1
E\W1
W/W2
OTC
OT2
C
R
OUTDOOR
HEATPUMP
C O N D E N S E R
YCON COM
O
W2
ED
R
W1
W2
C
24 VAC
S
W1
W2
WI
OT1
PJ4
TC
H
PJ2
OT2
HUM
PJ6
DI
PLEASE REFER
P
O
O
TO MANUAL
FF
N
FOR PROPER
DIP SWITCH
GOODMAN MFG. CO. L.P.
CONFIGURATION.
Y2
Y1
HUMIDISTAT
(OPTIONAL)
SEE NOTE 4
HUMIDISTAT
REMOVE
G
Y/Y2
HUM
PRODUCTION
WIRE Y1-O
Y1
1ST STAGE HEATER
G
Y2
Y1
HUMIDISTAT
(OPTIONAL)
SEE NOTE 4
HUMIDISTAT
REMOVE
Y1
G
Y/Y2
HUM
PRODUCTION
WIRE Y1-O
Y1
R
2ND STAGE HEATER
1ST STAGE HEATER

Advertisement

loading