Figure 10: Components to Remove from the Rear of the Device
NOTE: The procedure in this section for removing components from the chassis is
for initial installation only and assumes that you have not connected power cables
to the Ethernet appliance.
To remove the components from the device:
Attach an electrostatic discharge (ESD) grounding strap to your bare wrist, and
1.
connect the strap to one of the ESD points on the chassis. For more information
about ESD, see the IBM Ethernet Appliance J34S Hardware Guide.
Release each component by loosening its retaining screws and unlatching its
2.
ejector handles as appropriate. For full instructions on removing device
components, see the IBM Ethernet Appliance J34S Hardware Guide.
Slide each component out of the chassis evenly so that it does not become stuck
3.
or damaged.
Label each component as you remove it so you can reinstall it in the correct
4.
location.
Immediately store each removed component in an antistatic bag.
5.
Do not stack removed components. Lay each one on a flat surface.
6.
NOTE: For complete instructions on removing device components, see Installing
the Ethernet Appliance Without a Mechanical Lift" in the IBM Ethernet Appliance J34S
Hardware Guide.

Lift the Chassis into the Rack

Lifting the chassis and mounting it in a rack is a two person lift process. The empty
chassis weighs approximately 32.3 lb (14.7 kg).
Ensure the rack is in its permanent location and is secured to the building.
1.
Position the chassis in front of the rack or cabinet. Use a pallet jack if one is
2.
available.
Step 3: Install the Device
Step 3: Install the Device