Download Print this page
Salus AKL04P Installation And Wiring Manual

Salus AKL04P Installation And Wiring Manual

Zone pump wiring center

Advertisement

Quick Links

AUX
XX
TRANSFORMER
BOILER
POWER IN
L
N
120 VAC
Electrical connections
L
Line voltage 120VAC
N
Neutral
Ground
Night Set Back
Switch live output (0-24VAC)
Fuse
5 Amp Slow blow
AUX
Auxiliar, Dry contact
XX
Dry contact
Zone1 E/S
Zone1 E/S
Dry contact
C1
Communication Connections
C2
Communication Connections
For PDF Installation guide go to www.salusinc.com
www.salusinc.com
AKL04P Zone Pump Wiring Center
Group 1 thermostats
G1 (1-2)
H
N
H
N
H
H
N
H
N
H
R
W
C
R
W
C
R
ZONE1 E/S
24V - T-STAT 1
24V -T-STAT 2
GROUND
PRIORITY
PUMP2
PUMP3
PUMP4
PUMP1
L
N
L
N
L
N
L
120 VAC
GROUND
OUTPUT
120VAC TO PUMP Cables will
be supplied by the installer.
Technical Helpline 1-855-557-2587
Electrical connections for
Group 2 thermostats
24VAC thermostats
G2 (3-4)
H/R
Hot 24VAC
Switch live output (0-24VAC)
/W
N/C
Return 24VAC
N
H
N
Night Set Back
N
H
N
W
C
R
W
C
24V -T-STAT 3
24V -T-STAT 4
PRIMARY
PUMP5
PUMP6
PUMP
N
L
N
L
N
L
N
ZC
N
Installation and Wiring Guide
C1
C2
H
1-2
3-4
R
G1
G2
COMMS
A
NSB 1-2/3-4
POWER
PRIMARY
PRIORITY
ZONE 1
ZONE 2
ZONE 3
ZONE 4
MASTER
SLAVE
PRIORITY ON
OFF
EXERCISE ON
OFF
PRIMARY STATUS DURING PRIORITY ON
OFF
PURGE ON
OFF
These instructions apply to the SALUS model stated above.
Warning
This product must be fitted by a competent person, and installation must
comply with the guidance, standards and regulations applicable to the
country or state where the product is installed. Failure to comply with the
requirements of the relevant guidance, standards and regulations could
lead to injury, death or prosecution.
Warning
Always isolate the AC main supply before installing or working on any
components that require 120 V AC 60Hz supply.
The ground terminals on the AKL04P are for ground connections only.
These terminals provide no earth protection.
Maintaining a policy of continued product development SALUS Controls plc reserves the right to change
specification, design and materials of products listed on this installation guide without prior notice.
Issue Date: Feb 2017

Advertisement

loading

Summary of Contents for Salus AKL04P

  • Page 1 These terminals provide no earth protection. www.salusinc.com Technical Helpline 1-855-557-2587 Maintaining a policy of continued product development SALUS Controls plc reserves the right to change specification, design and materials of products listed on this installation guide without prior notice. Issue Date: Feb 2017...
  • Page 2 When the Master switch is set to ON and the Priority Switch is set to OFF, the ZC/N connector • on the AKL04P can be used to enable or disable the unit based upon the output from the boiler Warning...