Download Print this page

Sirius Satellite Radio Ursa Major Product Introduction page 10

Advertisement

焊接要点提示
1.2
Key points for welding and assembly
本品使用定位板卫星轴,可以从定位板开始,安装轴体和卫星轴并调试。
This product uses the positioning plate satellite. You can start from the
滚轮由于 打印尼龙件 *1 与 凯华编码器 *2 组。建议使用镊子调教
编码位置,以及编码器支撑脚的开合角度,使其匹配 PCB 孔位。
此外,编码器只需要焊接中间 3 脚以达成功能。
The roller component functions by printed-nylon roller * 1 and
It is recommended to use tweezers to adjust the encoder position
Make it match the PCB hole position. In addition, the encoder only
needs to weld the middle 3 pins to achieve the function.
plate, install the switch and satellite and adjust them.
灯珠长脚为正极,可根据 PCB 上标记进行安装。
确认无误后进行焊接工作,焊接完成后可以剪除多于的针脚。
The lamp bead long pin is a positive pole, which can be installed
referencing to the marks on the PCB.
Once confirmation, the welding work can be carried out, and cut off pin
extra part can after welding.
and the angle of the encoder support foot,
Kaihua encoder * 2
如选择在 PCB 与定位板之间安装隔音棉,
建议使用胶带固定信号天线,并施加一定
压力,优先焊接天线附近的轴体,以保证
内胆紧实。
If you choose to install sound insulation
cotton between PCB and the plate, it is
recommended to use adhesive tape to
lock the signal antenna, apply certain
pressure, and preferentially weld the
switches near the antenna to ensure that
the core sets tightly.

Advertisement

loading

Related Products for Sirius Satellite Radio Ursa Major