Figure 20. SAN Volume Controller 2145-CF8 cable-management arm, support rails, and

associated parts

Notes:
When you are ready to install the support rails, use the customer's
hardware-location chart and the Electronic Industries Alliance (EIA) positions on
the rack to determine where in the rack that the SAN Volume Controller node is to
be installed.
Perform the following steps to install the support rails:
24
IBM System Storage SAN Volume Controller: Model 2145-CF8 Hardware Installation Guide
10
9
8
7
Table 4. Cable-management arm and associated parts descriptions and quantities
Reference
Description
1
Slide rail (left)
2
Slide rail (right)
3
Large cable tie
4
Cable ties
5
M6 screws
6
10-32 screws
7
Cable-management support arm
8
Cable-management arm mounting bracket
9
Cable-management arm stop bracket
10
Cable-management arm assembly
v With some types of racks, you might find it helpful to remove the rack
doors and side panels to provide easier access during installation.
v The slide rails are marked (RIGHT / FRONT and LEFT / FRONT) for
proper placement on the rack flanges.
v The front and back of each rail has a spring-loaded rail-locking carrier,
which can be locked in the open position and then released when the rail
is in the rack.
1
4
5
6
2
3
Quantity