Removal of Electrical Box / PCB
Step
3. Remove the reactor.
Remove the 3 screws
1
of the reactor.
Remove the reactor.
2
4. Remove the thermistor
ASSY.
Remove the discharge
1
pipe thermistor.
14
Procedure
Reactor
Discharge pipe thermistor
Points
(R14893)
(R14894)
Be careful not to lose the
clip for the thermistor.
(R14895)
Removal Procedure
Si001170
Clip
(R12279)