5 INsTAllATON

5.1 Unpacking

Carefully open the shipping carton and check for any
damage to the PLM or the supplied accessories.
Every Lab.gruppen product is tested and inspected
before leaving the factory and should arrive in per-
fect condition. if any damage is discovered, please
notify the shipping company immediately. only the
consignee may initiate a claim with the carrier or their
insurers for damage incurred during shipping. Save
the carton and packing materials for the carrier's
inspection.
in addition to the PLM, the shipping carton should
contain the following items:
PLM Series Quick Start and Field Reference
Guide
aC mains lead (power cord)
Rear brackets for additional rack support (pair)
Mounting hardware for above
CD-RoM containing:
*
Dolby Lake Controller PLM Edition software and
firmware
*
PLM Series operation Manual
*
PLM Series network Configuration Guide
*
Dolby Lake Controller user Manual
*
Dolby Lake Controller user Manual PLM Edition
addendum
*
Release notes
*
PLM Series technical Data
*
PLM 10000Q a&E Specifications
We recommend that you keep the original carton and
all other packaging materials to facilitate shipping of
the PLM should the need arise.

5.2 Mounting

airflow for cooling the PLM is from front panel (intake)
to rear panel (exit). Racks containing PLM units must
not have any covering (such as doors or lids) that
could impede air flow while in operation.
always allow sufficient space at the rear of the PLM
to permit efficient air exit (see section 6.4) and to
accommodate rear connectors and cables. also,
allowance must be made for cable or loom bends
within a rack. in particular, the mains cable (aC cord)
and its neutrik
PowerCon
®
least 120 mm (4.75 inches) clear rack depth behind
the PLM's rear panel.
6 PLM Series Quick Start and Field Reference
connector require at
®
Guide
PLM Series products have no top or bottom vents;
therefore units may be safely stacked directly on top
of each other.
See the PLM Series operation Manual section 13.2
for more information about mechanical installation
and examples of rack mounting arrangements.

5.3 Rear Mounting

two rear support brackets, plus mounting
hardware, are included with the PLM (figure 5.3).
it is recommended that these are used wherever
possible. they should be fitted to vertical rack rails
at the rear of the rack. Refer to figures 5.3a and 5.3b
for details of their installation.
note that the support brackets are reversible and
may be fitted to point either to the front or rear of
the rack. the orientation used in a particular situation
will depend on the depth of the rack.
Figure 5.3a: Rear support mounting hardware
two mounting methods are possible; note that the
method shown in figure 5.3b additionally provides
extra security against unauthorized removal. For
situations where rapid removal and replacement of
units is of paramount importance, the method shown
in figure 5.3c may be used as it does not involve any
permanently secured fixing at the rear of the unit.
x2
x2
x2
x2