Download Print this page

Sullair SM160 Maintenance Manual page 25

Advertisement

CONTROL & INSTRUMENTATION
A6.2 Pressure Gauge Removal
Remove nylon pipes, remove pushin fittings from pressure gauge and
unscrew clamp nuts. Rotateclamping ring anticlockwise, remove ring,
pressure gauge can now be withdrawn.
OPERATION
The operation cycle is as follows:
Side A Purge
Repressurisation
Side B
Repressurisation
Complete cycle time 6 minutes.
150 seconds (Side B Drying 180 sec.)
Purge
150 seconds (Side A Drying 180 sec.)
30 seconds
30 seconds
Page 25 of 36

Advertisement

loading

This manual is also suitable for:

Sm240Sm320Sm400Sm480Sm560Sm640 ... Show all