SMA SUNNY ISLAND 4.4M Operating Manual page 163

Hide thumbs Also See for SUNNY ISLAND 4.4M:
Table of Contents

Advertisement

SMA Solar Technology AG
Event number
Message, cause and corrective measures
10101
Setting of parameter [xx] failed. |xx| to |xx|
The displayed parameter was not changed.
Corrective measures:
10102
Parameter [xx] set successfully. |xx| to |xx|
The displayed parameter was successfully changed.
10103
Setting of parameter [xx] failed. |xx| to |xx|
The displayed parameter was not changed.
Corrective measures:
10108
Time adjusted / old time
10109
Time adjusted / new time
10110
Time synchronization failed: |xx|
10114
No time information could be called up from the set NTP server.
Corrective measures:
10117
Invalid date > Set time and date
System time is invalid.
Corrective measures:
10118
Parameter upload successfully performed
The configuration file was loaded successfully.
10121
Setting of parameter [xx] failed. Device must be stopped first
10122
Setting of parameter Lxx failed. Installation assistant must be started
10248
Network busy > Network overloaded
10249
The network is busy. Data exchange between the devices is not at an optimum and is greatly
delayed.
Corrective measures:
Operating manual
• Make sure thresholds of the parameters are complied with.
• Change the parameter again.
• Make sure thresholds of the parameters are complied with.
• Change the parameter again.
• Ensure that the NTP server was configured correctly.
• Ensure that the inverter is integrated into a local network with Internet connection.
• Set the Date and Device Time via the installation assistant.
• Reduce the number of devices in the network.
• If necessary, increase the data query intervals.
• If necessary, reduce the number of devices in the network.
14 Troubleshooting
SI44M-80H-13-BE-en-15
163

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents