System Power-On And Power-Off; Power-On Procedure; Power-Off Procedure - NEC IE-V850E-MC User Manual

In-circuit emulator
Table of Contents

Advertisement

3.4 System Power-On and Power-Off

After connecting the IE-V850E-MC-A and each system component (PC, target system, etc.), start up and shut
down the system using the following procedure.

3.4.1 Power-on procedure

Make sure that the IE-V850E-MC-A is correctly connected to the PC before powering on.
If the IE-V850E-MC-A is powered on using a procedure other than the following one, the IE-V850E-MC-A or the
target system may be damaged.
(1) Turn on the power switch of the IE-V850E-MC-A.
Set the power switch to "ON" after connecting the power adapter to the power jack of the IE-V850E-MC-A and
the plug to the power outlet.
(2) Turn on the power of the target system.
(3) Start the debugger.

3.4.2 Power-off procedure

(1) Terminate the debugger.
(2) Turn off the power switch of the target system.
(3) Turn off the power switch of the IE-V850E-MC-A.
CHAPTER 3
CONNECTION OF COMPONENTS
User's Manual U14487EJ2V0UM
33

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ie-v850e-mc-a

Table of Contents