This section is intended to assist the operator with the initial
start-up of the unit. It is extremely important that
this section be read carefully before attempting
to use the mixer in the field. DO NOT use your
mixer until this section is thoroughly understood.
WARNING
Failure to understand the operation of the mixer could
result in severe damage to the mixer or personal injury.
Reference Figure 3 and Figure 4 for the location of any
components referenced in this manual.
CAUTION
NEVER operate the mixer in a confined
area or enclosed area structure that does
not provide ample free flow of air.
STARTING THE MIXER
The following steps outline the procedure for starting the
engine.
1. Place the fuel shut-off lever (Figure 14) in the ON
position.
OFF
Figure 14. Fuel Shut-Off Lever
PAGE 20 — MC94SK/PK CONCRETE MIXER • OPERATION MANUAL — REV. #0 (06/22/22)
FUEL VALVE
LEVER
ON
2. To start a cold engine, move the choke lever (Figure 15)
to the CLOSED position.
CHOKE LEVER
CLOSE
Figure 15. Choke Lever
3. Move the throttle lever (Figure 16) away from the slow
position, about 1/3 of the way toward the fast position.
Figure 16. Throttle Lever
FAST

START-UP

OPEN
THROTTLE
LEVER
SLOW