Patient (Sink) Leakage Current Test; (Mains Voltage On The Applied Part) - GE Solar 7000 Service Manual

Patient monitor
Table of Contents

Advertisement

Patient (Sink)
Leakage Current Test
(Mains Voltage on the
Applied Part)
3-14
MAINTENANCE: Electrical Safety Tests
NOTE
If either reading is greater than 50 µA (0.05 volts on the
DMM), the device fails this test. Contact GE Medical
Systems Information Technologies Technical Support.
7. Change the GND switch to the Closed position.
8. Read the leakage current indicated on the DMM.
9. Change the leakage current switch to the RVS position.
10. Read the leakage current indicated on the DMM.
NOTE
If either reading is greater than 10 µA (0.01 volts on the
DMM), the device fails this test. Contact GE Medical
Systems Information Technologies Technical Support.
11. Set the power switch of the device to OFF.
NOTE
The AAMI and IEC single fault condition (ground open)
is 50 µA, whereas the normal condition (ground closed) is
less.
This procedure only applies to Class I (grounded/earthed) equipment,
and measures the leakage current from a mains voltage source into the
ECG/RESP connector.
1. Configure the leakage tester like the circuit shown below with GND
switch CLOSED and polarity switch NORM.
Leakage Tester
HIGH
LOW
GND
120K
1K
DMM
DMM set to measure AC voltage
Solar 7000/8000/View Patient Monitor
414993-001
NORM
RVS
GND
Closed
ECG Test Body
or ECG Cable
0.15µF
10
(Keep cable length as
short as possible.)
Power Cord
Device
Under
Test
Revision J

Advertisement

Table of Contents
loading

This manual is also suitable for:

Solar 8000Solar solarview

Table of Contents