Patient Leakage Current Test - GE MAC 1200 Servicing Instructions

Hide thumbs Also See for MAC 1200:
Table of Contents

Advertisement

GE Medical Systems
MAC 1200 V 1.2
Page 59
Information Technologies
227 492 21 Rev F
During single fault conditions (S.F.C.), referring to the electrical diagram, the
measurements have to be done under the following conditions:
Polarity switch
NORM and RVS
GND switch
GND open
S1
closed
Test has failed if the measured values are greater than:
N.C.
S.F.C
100 pA
500 uA
300 pA (UL requirements)
Electrical Diagram for Enclosure Leakage Current Test
7.1.3.3.2
Patient Leakage Current Test
This test performs a leakage current test under
Safety Tester
single fault conditions (S.F.C.) depending on
domestic power outlet of 115 or 230 V AC as
source into the floating inputs.
POWER CORD
unr
oer
In all cases, the leakage current is measured
from input jack of the unit being tested to
T"
»
ground.
Connect the unit being tested to your Safety
Tester.
m@ Referring to the electrical diagram, measurements have to be done under the following
conditions:
*
Polarity switch
NORM and RVS
*
GND switch
GND closed
*
S1
closed
Test has failed if the measured values are greater than 50 pA.

Advertisement

Table of Contents
loading

Table of Contents