Section 8. Refrigerant Line Leak Check - Trane 4TTX8 Installer's Manual

Table of Contents

Advertisement

STEP 5 - Replace the pressure tap valve cores
after the service valves have cooled.

Section 8. Refrigerant Line Leak Check

8.1 Check For Leaks
STEP 1 - Pressurize the refrigerant lines and
evaporator coil to 150 PSIG using dry nitrogen.
STEP 2 - Check for leaks by using a soapy solu-
tion or bubbles at each brazed location.
Remove nitrogren pressure and repair any leaks
before continuing.
18-AC95D1-5C-EN
150 PSIG
11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

4ttx8024a4ttx8036a4ttx8048a4ttx8060a

Table of Contents