Table of Contents

Advertisement

Test Submenu

4
Press
to move up a menu level, or
ESC
This does not make the configuration changes permanent. The
make the changes permanent.
T
S
EST
UBMENU
PG-Plus supports testing of a subscriber drop in two ways. A test can be initiated by applying a test voltage
between the Tip and Ring at the COLU through an MLT test set, or by selecting it from the menu item through
the VT-100 terminal connected to the PAU/PMU maintenance port. The relays in the COLU and RT provide a
path for performing a SDT.
1
Select Test at the menu bar and press
2
Scroll to the desired POTS1 or ISDN1 option and press
3
Use the
key to move to the desired circuit to test, then press
TAB
4
A warning displays when a channel is selected for the test.
34
+
to return to the PAU/PMU Main menu.
CTRL
R
to display the submenu.
ENTER
to start the test:
ENTER
January 6, 2003
SCP-PLL724-010-04H
Save Configuration
option must be used to
.
ENTER
PLL-724 List 1

Advertisement

Table of Contents
loading

Table of Contents