ADC DSX-3 Installation Manual page 27

Rear cross-connect system
Hide thumbs Also See for DSX-3:
Table of Contents

Advertisement

ADCP-80-353 • Issue 2 • August 2002 • Section 2: Installation
UPPER
CROSS-
CONNECT
WIREWAYS
CROSS-
CONNECT
JUMPER
VERTICAL
CROSS-
CONNECT
WIREWAYS
CONNECT
WIREWAYS
NOTE: BASED ON THE TYPE OF CABLE SELECTED FOR EQUIPMENT IN/OUT CABLING AND CROSS-CONNECT JUMPER,
ROUTING RULES
A. All jumpers in the left-hand side of the cross-connect field should enter and leave the bay from the left vertical wireways.
B. All jumpers in the right-hand side of the cross-connect field should enter and leave the bay from the right vertical wireways.
C. All intrabay cross-connects should use the vertical rings except when terminations are in the same panel.
D. All interbay cross-connects should use the horizontal wireways.
E. All jumpers originating in the upper half of the cross-connect field should route via the upper horizontal wireways.
F. All jumpers originating in the lower half of the cross-connect field should route via the lower horizontal wireways.
G. Whenever a jumper changes direction, it should do so at a ring or wireway.
Page 2-10
© 2002, ADC Telecommunications, Inc.
E
A
B
LOWER
CROSS-
THE ADC RECOMMENDED SPACING IS AS FOLLOWS:
APPLICATION
EQUIPMENT I/O
X-CONN
735A/734A
735A OR RG59
Figure 2-8. Recommended Cross-Connect Routing
D
C
G
F
D
G
RECOMMENDED SPACING
SPACERS REQUIRED FOR UEF BAYS
ONE 10-INCH (25.4 CM) BETWEEN BAYS
WITH ONE 5-INCH (12.7 CM) ON THE ENDS
B
C
A
9202-A

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dsx-4u-24

Table of Contents