ADC DSX-3 Installation Manual page 23

Rear cross-connect system
Hide thumbs Also See for DSX-3:
Table of Contents

Advertisement

ADCP-80-353 • Issue 2 • August 2002 • Section 2: Installation
When bringing the cables into the bay, make sure that all cables carrying digital signals away
from the bay are run vertically along the right side of the bay (as viewed from the front), and all
cables carrying signals to the bay are run vertically along the left side. The cables should be run
in the rack duct and attached to appropriate cable tie brackets in the duct using nylon tie-wraps
or cable lacing. Any cables not contained in the duct should be secured to the cable brackets on
the rear of the bay. If the cables are coming into the bay from above, cable attachment should
start at the bottom and work up (refer to
Page 2-6
© 2002, ADC Telecommunications, Inc.
Figure
2-4).
SPACER
OR
FILLER KIT
Figure 2-4. Cable Routing from Top to Bottom
NETWORK
ELEMENT
CABLES
8656-A

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dsx-4u-24

Table of Contents