Download Print this page

Hussmann IMPACT Elite E2V Joining Instructions page 6

Vertical glass service merchandisers joining instruction
Hide thumbs Also See for IMPACT Elite E2V:

Advertisement

P/N 0430502
Move the second merchandiser
9
into position against the first.
Match the alignment pins
with the corresponding holes.
See Figure 6, Details H and I.
Top
Alignment
Pin
Alignment Pins
6
The complete lineup must
10
be leveled to the highest
point of the floor. After the
first merchandiser has been
set, position the second so
the end frames touch.
DETAIL H.
CASE 1
DETAIL I.
Figure 6. Leveling Merchandisers
HUSSMANN CORPORATION • BRIDGETON, MO 63044-2483 (Printed in U.S.A.)
A. Set a long level (4 foot or
more) on the upper front panel
of the merchandisers. Adjust
case height by rotating the
Adjustable Leg Leveler until
the merchandisers are flush
and level.
See Figure 6, Detail J.
B. Also check each joint area
to be sure that the panels of
adjoining merchandisers are
flush to each other.
CASE 2
Levels on Upper
Levels on Upper
Front Panel
Front Panel
Adjustable
Leg Leveler
Raise
DETAIL J.
®
M
INIMUM
H
EIGHT
M
AXIMUM
H
EIGHT
Lower

Advertisement

loading

This manual is also suitable for:

EsbdvsEsgmvsImpact elite esbdvsImpact elite esgmvs