Cisco 2654T6 Repacking Manual page 21

Cisco systems router owner's manual
Table of Contents

Advertisement

Appendix A
Repackaging the Router
Repackaging the Vertical Cable-Management Troughs
Step 1
Step 2
Step 3
Step 4
Step 5
Step 6
Repackaging the Center-Mount Rack-Mounting Brackets
Step 1
Step 2
Step 3
Step 4
Step 5
OL-17440-01
To repackage the vertical cable-management troughs, follow these steps:
Place the six screws in a plastic bag.
Insert the trough into the long plastic bag.
Put the foam cap on each end of the trough.
Place the trough and the bag of screws into the corrugated carton.
Close and seal the carton.
Repeat
Step 1
through
If you used the optional center-mount rack-mounting brackets to install the router
in the equipment rack, you must repackage the brackets.
To repackage the brackets, follow these steps:
Remove the brackets from the rack and place all of the screws in a plastic bag.
Turn the brackets so the screw rails are interlocked.
Hold the brackets together and put the two foam caps on the ends of the brackets.
Place the brackets and the bag of screws into the corrugated carton.
Close and seal the carton.
Cisco XR 12416 and Cisco XR 12816 Router Chassis Installation Guide
Step 5
for the second trough.
Repackaging the Routers
A-21

Advertisement

Table of Contents
loading

This manual is also suitable for:

Stev srt-m-66Xr 12416Xr 12816

Table of Contents