Cisco 2654T6 Repacking Manual page 18

Cisco systems router owner's manual
Table of Contents

Advertisement

Repackaging the Routers
Shift the pallet to ensure that it is positioned evenly all the way around the
Step 8
scissor-jack platform and the bolt holes in the hold-down brackets on the sides of
the scissor-jack platform are aligned with the holes in the top of the shipping
pallet.
Turn the scissor-jack screw slowly clockwise to close the scissor-jack platform
Step 9
and lower the top of the scissor-jack platform slowly until the hold-down brackets
touch the top of the shipping pallet.
Set a blocking plate into the hold-down bracket so that the blank side of the
Step 10
blocking plate is against the heads of the bolts in the side of the scissor-jack
platform and the open holes in the blocking plate align with the bolt holes in the
top of the pallet.
Insert bolts through each of the hold-down bracket holes and into the holes in the
Step 11
top of the shipping pallet, then use the 9/16-inch (14-mm) wrench to tighten the
bolts.
Turn the scissor-jack screw slowly clockwise to collapse the scissor-jack platform
Step 12
and raise the base of the scissor-jack platform until the weight of the router and
scissor-jack platform is absorbed by the pallet. Continue turning the scissor-jack
screw clockwise to close the scissor-jack platform and lift the base of the
scissor-jack platform until the scissor-jack platform is completely closed (the
screw can not be turned).
Cisco XR 12416 and Cisco XR 12816 Router Chassis Installation Guide
A-18
Appendix A
Repackaging the Router
OL-17440-01

Advertisement

Table of Contents
loading

This manual is also suitable for:

Stev srt-m-66Xr 12416Xr 12816

Table of Contents