Items
Adjustment
(A) 4.0V Supply
Confirmation
(B) 4.0V Supply
Confirmation
(C) 3.2V Supply
Confirmation
(D)
1.8V Supply
*
Confirmation
(E)
BBIC
*
Confirmation
(F)
EEP-ROM
*
Confirmation
Point
1. Confirm that the voltage between TP14 and GND is 4.0V ± 0.2V.
TP14
1. Confirm that the voltage between TP3 and GND is 4.0V ± 0.2V.
TP3
1. Confirm that the voltage between TP22 and GND is 3.15V ± 0.2V.
TP22
1. Confirm that the voltage between TP15 and GND is 1.8V ± 0.02V.
TP15
2. Adjust the 1.8V voltage of TP15 executing the command
"bandgap XX" (XX is the value).
1. BBIC Confirmation (Execute the command "getchk").
-
2. Confirm the returned checksum value.
Connection of checksum value and program number is
shown below.
1. EEP-ROM Confirmation.
-
2. Confirm the returned checksum value.
Procedure
57
Check
Replace
CN2,
D1,
C211,
IC1,
CN2,
D1,
C211,
IC15,
Q2,
R13,
Q3,
C43,
C39,
C45,
IC3,