INSTALL THE HOOD

(Ducted Installation only) (cont'd)
5. Measure
the
length
of
6"
round
metal
duct
required
from the blower
exhaust opening
to the ductwork
rough-in in the
ceiling. Connect
LOUVERS
the duct to the
blower exhaust
opening
and
seal with duct
tape.
6. Remove
the
BLOWER
EXHAUST
p r o t e c t i v e
OPENING
coating from the
inner the flue.
FOR
CEILING
HEIGHTS 7-FT.
8-IN. & 8-FT.
ONLY: Turn the
inner flue so that
the louvers are
at the bottom.
FOR
ALL
C E I L I N G
HEIGHTS:
Carefully
slide
the inner flue
(8) M4 x 10mm
down into the
PAN HEAD
MACHINE
outer
flue.
SCREWS
Slide the flues
over the angle
brackets. Make
sure
the
side
marked
"front"
faces the control
side of the hood.
Feed the power
cable up through
the flues.
7. Attach the hood
assembly to the
ceiling
bracket
using (8) M4 x 10mm machine screws (2 for each support
leg).
8. Connect metal duct to ceiling duct and seal with duct tape.
METAL
DUCT
METAL
DUCT
F R
O N
T
INSTALL THE HOOD
(Ducted Installation only) (cont'd)
9. Connect power cable to house wiring inside of electrical
outlet box. Connect the neutral conductor of product
(WHITE) to the neutral conductor (WHITE) of the house
power cable, connect the live conductor of product (BLACK)
to the live conductor (BLACK) of the house power cable and
INNER
connect the grounding conductor of product (GREEN) to the
FLUE
grounding conductor (GREEN) of the house power cable.
Secure power cable to wiring box with appropriate wire
POWER
clamp and re-attach outlet box cover.
CABLE
10. Slide the inner
flue up to the
ceiling
secure with (4)
OUTER
FLUE
M4 x 8mm sheet
metal screws.
DUCT
TAPE
11. Remove
p r o t e c t i v e
coating from the
hood and the
outer flue.
POWER
CABLE
MODEL EIT1366SS