GAS FIRED CONTINUOUS FLOW WATER HEATER COMMISSIONING CHECKLIST

This Commissioning Checklist is to be completed in full by the competent person who commissioned the water heater as a means of
demonstrating compliance with the appropriate Building Regulations and then handed to the customer to keep for future reference
Failure to install and commission according to the manufacturer's instructions and complete this Benchmark Commissioning Checklist will invalidate the
warranty. This does not affect the customer's statutory rights.
Customer name:
Address:
Water Heater Make & Model:
Serial Number:
Commissioned by (PRINT NAME):
Company name:
Company address:
To be completed by the customer on receipt of a Building Regulations Compliance Certificate*:
Building Regulations Notification Number (if applicable)
CONTROLS
Is there a separate temperature control fitted
Have they been explained to the customer
Has the Appliance been set to the required MAX temp.
If NO has the Appliance been set to the required temp.
SYSTEM
Is there a filter on the incoming mains
Is the system on a secondary return
Has an unvented kit been installed
If yes please record Safety Valve Size and rating
Does the discharge pipe comply with current building regulations
Please record location of Pressure Reducing Valve
Pressure Reducing Valve Setting
Expansion Vessel Size
Expansion Vessel Charge Pressure
Has the system been installed with a storage vessel
DOMESTIC HOT WATER MODE
Gas Rate at High Fire
Burner Pressure
Inlet Pressure Dynamic at Hi Fire and all other appliances running
Inlet water temp
Water Heater Set Temperature
Maximum Flow Rate Achieved
Is the installation in a hard water area (above 150mg/L)
If Yes What Type of Scale Reducer has been Fitted
Hot Water checked at all outlets
FLUEING
What type of water heater is fitted
EXTERNAL is the unit mounted fully outside
If NO explain in detail where the appliance is mounted
INTERNAL does the flueing comply with current standards
If the flueing to manufacturers instructions
CONDENSING WATER HEATERS ONLY
Has the condensate drain has been installed as per manufacturers instructions and/or BS5446/BS6798
FULL INSTALLATION
At max rate: CO ppm
Record the following:
At min. Rate: (where possible) CO ppm
Does the hot water system fully comply with the appropriate Building Regulations
The water heater and associated products have been installed and commissioned in accordance with all manufacturers instructions
The full operation of the water heater and any controls have been demonstrated to and understood by the customer
The manufacturers literature including Benchmark Checklist and Service Record, has been explained and left with the customer
Commissioning Engineer's Signature
Customer's Signature
(To confirm satisfactory demonstration and receipt of manufacturer's literature)
* All installations in England and Wales must be notified to Local Authority Building Control (LABC) either directly or through a
Competent Persons Scheme. A Building Regulations Compliance Certificate will then be issued to the customer.
© Heating and Hotwater Industry Council (HHIC)
Telephone number:
Gas Safe Register Number:
Telephone number:
Commissioning date:
Size
m³/hr
Lo
mbar
mbar
L/min
Internal
and
and
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Yes
No
Rating
Yes
Yes
No
ft³/hr
Hi
mbar
°C
°C
Yes
No
Yes
Temp
External
Yes
No
Yes
No
Yes
No
Yes
No
CO/CO2 Ratio
CO/CO2 Ratio
Yes
Yes
Yes
Yes
www.centralheating.co.uk