Installation

1. Before beginning installation, remove power from the Unit.
2. Check to make sure all necessary parts were included in the kit.
3. 12 ½ - 25 ton units: Use the two #8-32 x ½" screws to mount the bracket to holes in front of
Figure 1.
ACC-SVN129D-EN
the ReliaTel RTRM board in the Voyager control box. See
3-10 ton units: Use the two #10-32 x ½" screws to mount the bracket. See
6 - 7½ ton split system units: If the control box does not have pre-drilled holes to mount
the bracket, using a #29 drill (Diameter 0.136" hole), drill two engagement holes in the right-
hand back corner of the control box floor. Use the two #8-32 x 1/2" screws to mount the bracket
to the Odyssey control box. See
10 - 12½ ton split system units: If the control box does not have pre-drilled holes to mount
the bracket, using a #29 drill (Diameter 0.136" hole), drill two engagement holes in the front
edge of the control box floor. Use the two #8-32 x 1/2" screws to mount the bracket to the
Odyssey control box. See
15 - 25 ton split system units: Using a #29 drill (Diameter 0.136" hole), drill two engagement
holes in the floor of the low voltage section of the control box. Use the two #8-32 x 1/2" screws
to mount the bracket to the Odyssey control box. See
12 ½ - 25 Ton Packaged Rooftop Units