Temperature And Humidity Guidelines; Power Connection Guidelines - Cisco ASR 9001 Installation Manual

Hide thumbs Also See for ASR 9001:
Table of Contents

Advertisement

Chapter 1
Preparing for Installation
Figure 1-6

Temperature and Humidity Guidelines

The operating and nonoperating environmental site requirements are listed in
normally operates within the ranges listed in
approaching a minimum or maximum parameter, it indicates a potential problem. Maintain normal
operation by anticipating and correcting environmental anomalies before they approach critical values,
by properly planning and preparing your site before you install the router.

Power Connection Guidelines

You can configure the router with either an AC-input or DC-input power subsystem, so the site power
source requirements differ depending on the power subsystem in your router. Ensure all power
connection wiring conforms to the rules and regulations in the National Electrical Code (NEC) as well
as local codes.
OL-26701-01
ASR 9001 Clearance Requirements for an Enclosed 4-Post Rack Installation
6 Inches
152.0 mm
Rear of chassis
Front of chassis
Table
A-3; however, if a temperature measurement is
Cisco ASR 9001 Router Hardware Installation Guide
Site Requirement Guidelines
6 Inches
152.0 mm
3.25 Inches
82.55 mm
Table
A-2. The router
1-11

Advertisement

Table of Contents
loading

Table of Contents