Download Print this page

Navien PeakFlow A Installation Instructions Manual page 5

Advertisement

Media Bed Loading Procedure
1.
Place the distributor tube back down the center of the tank. Plug top of the distributor tube with a rag or cork or tape to
prevent media from entering.
2. Then pour the bag of media into the tank.
Note: it is important that the distributor tube is not moved or pulled during this process, as it is not possible to put it down the
bottom of the tank once gravel and media are in the tank.
Remove the adapter
from the mineral tank
Parts
Description
20 inch glass fiber tank with a black jacket
IN/OUT HEAD C/W 3/4" FITTINGS
STD 1.05 OD DISTRIBTUION TUBE
WALL BRACKET
SCREWS FOR BRACKET
CARTON, BROWN, TANK
Resin, "AraGone" TM
T
H
E
L
E
A
D
Temporary plug the open end of the rise.
The rise (distributor remain inside the tank,
seated in the depression at the bottom.
Quantity
1
EA
1
EA
1
EA
1
EA
4
EA
1
EA
1
LT
E
R
I
N
C
O
PeakFlow
Installation Instructions
The riser (distributor)
remains inside the tank
seated in the depression
at the bottom
N
D
E
N
S
I
N
G
A System
®
Pour gravel,
then media
Fill the gravel (support bed) first.
The media will not always spill down inside
the tank and may need to be swept inside.
The use of a funnel may make the filling of
the tank easier and neater.
T
E
C
H
N
O
L
O
G
Y

Advertisement

loading

This manual is also suitable for:

Gpwc310001ac001