FIREBRICK WALL INSTALLATION

IMPORTANT: Installation of brick
should be done after the fire-
place is placed in a permanent
location.
1. The fireplace is shipped with the hearth
preinstalled. It is held in place for ship-
ping with 3 shipping brackets (Figure 13).
Remove these brackets before installing
any of the other firebrick walls.
Shipping
Brackets
Figure 13 - Removing Shipping Brackets
2. Install the left and right firebrick walls.
There is a bracket with 2 tabs on the
bottom of each firebrick wall. Angle the
wall into the fireplace opening and into
the slots on the side of the hearth (Figure
14), then tilt the top of the panel toward
the firebox surround.
Slot
Hearth
Figure 14 - Slots for Firebrick Walls
14
Right Face
www.SuperiorFireplaces.US.com
3. Secure the firebrick wall using 2 of the
retainers provided. The bracket will slip
underneath the metal lip on the top of the
wall and screw into the inner dome of the
fireplace (Figure 15).
4. Install the rear firebrick wall last. Place
the wall face side down on the hearth with
the bottom of the wall toward the rear of
the firebox and the top toward the front of
the fireplace. Tilt the wall up toward the
back of the firebox. Secure with remaining
retaining brackets provided (Figure 15).
Figure 15 - Installing Side Walls
5. It is recommended that the joints between
all firebrick walls be grouted for a more
finished look, see page 15 for grouting
instructions.
For more information and to watch a how
to video go to www.IHP.US.com and select
Technical Support.
Retaining
Bracket
127016-01A

Advertisement

Table of Contents
loading

Table of Contents