Bradford White CDW2TW50T10FBN Manual page 26

Power vent gas water heater
Hide thumbs Also See for CDW2TW50T10FBN:
Table of Contents

Advertisement

Vent Pipe Preparation and Joining continued-
d) Cementing must be done quickly to avoid over-drying before
joining.
i)
Apply one coat to the outside end of the pipe at a w idth
slightly greater than the depth of the socket.
ii) Apply a coat around the inside of the fitting socket.
iii) Apply a second coat around the end of the pipe.
4) Joining
a) Joints should be made immediately after cement is applied.
b) After fully inserting pipe into fitting socket, hold joint together for
about 15 to 20 seconds.
c) Remove excess cement from around pipe and fitting w ith a clean
rag.
d) Cement drying times may vary. Be sure to allow for the
recommended drying time before disturbing joints.
For more specific and detailed information about the above, contact the
vent pipe manufacturer, supplier, or competent professional.
26

Advertisement

Table of Contents
loading

Table of Contents