Installation - Desa SF20NTX Safety Information And Installation Manual

Unvented (vent-free) solar fusion gas heater
Table of Contents

Advertisement

Available languages

Available languages

AIR FOR COMBUSTION
AND VENTILATION
Continued
Ventilation Air From Outdoors
Provide extra fresh air by using ventilation grills
or ducts. You must provide two permanent open-
ings: one within 12" (30.4 cm) of the ceiling and
one within 12" (30.4 cm) of the floor. Connect
these items directly to the outdoors or spaces
open to the outdoors. These spaces include attics
and crawl spaces. Follow the National Fuel Gas
Code, ANSI Z223.1/NFPA 54, Section 5.3, Air for
Combustion and Ventilation for required size of
ventilation grills or ducts.
IMPORTANT: Do not provide openings for inlet
or outlet air into attic if attic has a thermostat-
controlled power vent. Heated air entering the attic
will activate the power vent.
Outlet
Air
Outlet
A ir
Inlet
Air
Inlet Air
Figure 3 - Ventilation Air from Outdoors

INSTALLATION

NOTICE: This heater is intended
for use as supplemental heat.
Use this heater along with your
primary heating system. Do not
install this heater as your pri-
mary heat source. If you have a
central heating system, you may
run system's circulating blower
while using heater. This will help
circulate the heat throughout the
house. In the event of a power
outage, you can use this heater
as your primary heat source.
117933-01A
Ventilated
Attic
To Attic
To
Crawl
Space
Ventilated
Crawl Space
www.desatech.com
WARNING: A qualified ser-
vice person must install heater.
Follow all local codes.
CHECK GAS TYPE
Use only the correct type of gas (natural or pro-
pane/LP). If your gas supply is not the correct gas
type, do not install heater. Call dealer where you
bought heater for proper type heater.
WARNING: This appliance
is equipped for (natural or pro-
pane/LP) gas. Field conversion
is not permitted.
INSTALLATION ITEMS
Before installing heater, make sure you have the
items listed below.
• for propane/LP gas, external regulator (supplied
by installer)
• piping from gas supply (check local codes)
• flex gas tubing
• sealant (resistant to propane/LP gas)
• equipment shutoff valve*
• flex gas line with 3/8" NPT tap
• ground joint union
• sediment trap
• tee joint
• pipe wrench
• for natural gas, test gauge connection*
* A CSA design-certified equipment shutoff valve
with 1/8" NPT tap is an acceptable alternative to
test gauge connection. The optional CSA design-
certified equipment shutoff valve can be purchased
from your dealer. See Accessories, page 21.
7

Advertisement

Chapters

Table of Contents
loading

Table of Contents