• Every 2 Hours of Running Time:
• Every 3 Hours of Running Time:
• Every 5 Hours of Running Time:
• Every 6-8 Hours of Running Time:
• Every Year:
• Every 2 Years:
DATE
Maintenance Schedule
Clean and lubricate table top, miter slot and fence.
Check blade tracking, guide column and table-to-blade.
Check gap on guide blocks and thrust bearings. Check blade
tension.
Oil guide post with light machine oil.
Replace blades.
Replace the rubber V-Belt (recommended).
Replace the rubber tires on the wheels (recommended).
Maintenance Notes
MAINTENANCE PERFORMED
35