LG LMV1976 Installation Instructions Manual page 18

Table of Contents

Advertisement

STEP 6:
ATTACH THE OVEN TO THE WALL
6. Roof vented installation:See Figure 33
Install ductwork through the vent opening in the
upper cabinet. Complete the venting system through
the roof according to the method needed.
See "PREPARE THE VENTING SYSTEM," STEP 2
on the page 8. Use caulking to seal exterior roof
opening around the exhaust cap. See Figure 6 on
page 8.
7. Use power supply cord clamp to bundle the power
supply cord. Install the power supply cord clamp,
using a screw as shown in Figure 34, to inside of the
cabinet.
8. To install the grease filter: Slide it into the slide slot,
then push up and toward oven center to lock.
See Figure 35.
9. Plug in the power supply cord.
10. Read your Owner's Manual, then check the
operation of your microwave oven.
duct
— 18 —
damper
Figure 33
power
supply
cord
clamp
Figure 34
Figure 35

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lmv1976st

Table of Contents