Cisco N9K-C9332PQ Hardware Installation Manual page 53

Aci-mode switch
Hide thumbs Also See for N9K-C9332PQ:
Table of Contents

Advertisement

Replacing Components
with the electrical connections) to the open power supply slot before carefully sliding the power supply all the way
into the slot until it clicks into place.
Note
If the power supply does not fit into the open slot, turn the module over before sliding it carefully into the
open slot.
b) Test the installation by trying to pull the power supply out of the slot without using the release latch.
If the power supply does not move out of place, it is secured in the slot. If the power supply moves, carefully press
it all the way into the slot until it clicks in place.
c) Attach the power connector block end of the power cable to the electrical outlet on the front of the power supply.
d) Turn on the circuit breaker for the power source.
e) Verify that the power supply is operational by making sure that the power supply LED is green.
Cisco Nexus 9332PQ ACI-Mode Switch Hardware Installation Guide
Replacing a DC Power Supply
43