Toshiba MV9DL2 Service Manual page 12

Color television/video cassette recorder
Hide thumbs Also See for MV9DL2:
Table of Contents

Advertisement

2-6: LINK UNIT (Refer to Fig. 2-6)
1.
Set the Link Unit to the Eject position.
2.
Remove the (A) side of the Link Unit first, then remove
the (B) side.
Link Unit
Link Unit
(A)
Main Chassis
2-7: LOADING MOTOR ASS'Y (Refer to Fig. 2-7)
1.
Remove the Link Lever.
Remove the screw 1.
2.
3.
Remove the Loading Motor Ass'y.
Main Chassis
• Screw Torque: 5 ± 0.5kgf•cm
2-8: SENSOR COVER L3 (Refer to Fig. 2-8)
Unlock the support 1 and remove the Sensor Cover L3.
1.
Main Chassis
1
All manuals and user guides at all-guides.com
DISASSEMBLY INSTRUCTIONS
(B)
Main Chassis
Fig. 2-6
Loading Motor Ass'y
1
Link Lever
Fig. 2-7
Sensor Cover L3
Fig. 2-8
2-9: TENSION ASS'Y (Refer to Fig. 2-9-B)
1.
Turn the Middle Gear clockwise so that the Tension
Holder hook, is set to the position of Fig. 2-9-A to more
the Tension Arm Ass'y.
2.
Remove the Tension Spring.
Unlock the support 1 and remove the Tension Arm
3.
Ass'y.
4.
Remove the Tension Adjust.
Unlock the 2 supports 2 and remove the Tension Band
5.
Ass'y.
Float the hook 3 and turn it clockwise then remove the
6.
Tension Holder.
7.
Remove the SS Brake Spring.
8.
Remove the SS Arm Brake.
Tension Arm Ass'y
Tension Spring
SS Brake Spring
SS Arm Brake
NOTE
When you install the Tension Adjust, install as shown in
Fig. 2-9-C. (Refer to Fig. 2-9-C)
Adjust the direction of the Marker to inside.
B2-2
Fig. 2-9-A
Tension Adjust
2
2
Tension Band Ass'y
Tension Arm Ass'y
1
Tension Holder
3
Inclined S Ass'y
Fig. 2-9-B
Fig. 2-9-C

Advertisement

Table of Contents
loading

Table of Contents