Separate all hardware from the packages in the rail carton and the opener carton as shown below, for the
assembly and installation procedures.
Washered Screw
5/16" - 18 x 1/2" (2)
(mounted in chassis)
Lag Screw
5/16"- 9 x 1-5/8" (4)
Carriage Bolt
5/16"-18 x 2-1/2" (2)
5/16" x 2-3/4" (1)
Lag Screw
1/4 x 1-1/2" (4)
Hex Screw
1/4-20 x 1-1/2" (2)
Assembly Hardware
Hex Screw
5/16" - 18 x 7/8" (3)
Threaded
Trolley Shaft (1)
Installation Hardware
Nut 5/16" - 18 (6)
Clevis Pin
Safety Reversing Sensor
Installation Hardware
Hardware
Nut
5/16" - 18 (5)
Ring
Fastener (3)
Hex Screw
5/16"- 18 x 7/8" (4)
Screw
6AB x 1" (2)
Clevis Pin
5/16" x 1-1/4" (1)
Carriage Bolts
1/4" - 20 x 1/2" (4)
Screw
#10 - 32 x 3/8" (4)
7
7
Carriage Bolts
1/4" - 20 x 1/2" (12)
Lock Washer
1/4" - 20 x 7/16" (12)
5/16" (4)
Handle
Lock Washer 5/16" (6)
Insulated
Staples (10)
Dry Wall Anchors (2)
5/16" x 1" (1)
Lock Nut
1/4" - 20 (4)
Lock Nut
#10 x 32 (4)
Master Link (2)
Lock Nut
Rail Grease
Rope
Clevis Pin
Wing Nut (2)
Insulated
Staples (20)